888.303.ZINC (9462)
0 Items
888-303-9462

When you commission a custom metal countertop, bar top, or range hood, you are not placing a standard order — you are entering a creative and technical partnership with skilled artisans who will handcraft something entirely one of a kind. Understanding how that process works, from the first conversation to the day of installation, helps every project unfold with clarity, confidence, and the right expectations on both sides. Whether you are an interior designer specifying a cast zinc bar top for a boutique hotel or a homeowner envisioning a hand-finished brass countertop for your kitchen, this guide walks you through exactly what working with a metal countertop fabricator looks like, step by step.


Step One: The Design Consultation

Every custom project begins with a conversation. At La Bastille, we treat the initial consultation as a genuine exchange — not a sales pitch. Our in-house designers and sales coordinators take time to understand your space, your aesthetic goals, and the functional demands of the surface you have in mind.

During this conversation, we will typically ask:

  • What is the intended use? A residential kitchen countertop, a commercial bar top, and a restaurant pass-through surface each carry different performance requirements.
  • Which metal speaks to your vision? Cast zinc, pewter, brass, bronze, and copper each have distinct personalities, patina trajectories, and finish possibilities. We will walk you through the differences in plain language.
  • What are your spatial constraints? Dimensions, sink cutouts, appliance placements, edge profiles, and substrate considerations all come into play early.
  • What is your timeline? Knowing your installation date at the outset allows us to plan fabrication realistically and avoid the rush-driven compromises that undermine craftsmanship.

We encourage you to bring reference images, architectural drawings, or even a rough sketch. There is no wrong starting point. Our team brings both technical and artistic expertise to the table, and we are accustomed to translating early-stage ideas into precise specifications.

What to Prepare Before Your First Call

Coming prepared accelerates everything downstream. If you can provide rough dimensions, a sense of the finish direction — polished, brushed, naturally patinated, or aged — and any edge profile preferences, we can make the consultation far more productive. If you are a designer or architect, sharing your project drawings in PDF or DWG format at this stage is ideal.


Step Two: Proposal, Pricing, and Material Selection

Following your consultation, our team prepares a detailed proposal that outlines material selection, dimensions, edge profiles, finish specifications, and pricing. You can typically expect to receive this within one to two business days of your initial conversation.

This is also the stage where material selection becomes concrete. Here is a brief guide to the living metals we work with most:

Cast Zinc

Our most recognized material worldwide. Zinc’s blue-grey hue and long history in architectural applications — from Parisian rooftops to ornamental details — make it one of the most versatile metals we handcraft. It ages gracefully, developing warmth and character over time, and can be finished to look as though it has been in place for generations. Zinc countertops range from sleek and modern to richly ornate.

Pewter

Centuries of use in French bistros and brasseries have proven pewter’s durability and timeless elegance. Composed primarily of tin, pewter carries a vibrant silvery hue when polished and develops a luminous grey or charcoal patina naturally over time. It can be maintained to a near-mirror finish or allowed to evolve on its own — a living surface in the truest sense.

Brass, Bronze, and Copper

Each of these alloys brings its own visual depth and patina story. Bronze, considerably harder than zinc or pewter, offers finishes ranging from polished golden tones to rich antiqued brown and is increasingly specified for both residential and commercial countertops. Brass carries warmth and a slightly more formal character. Copper develops its distinctive patina with remarkable speed, giving surfaces a dynamic, ever-evolving quality.

No material choice is wrong. Each one is a commitment to something beautiful and enduring. We are here to help you match the right metal to the right project.


Step Three: Design Approval and Technical Shop Drawings

Once you have accepted the proposal, our in-house designers move into the technical phase of the project. This is where concept becomes construction-ready specification.

We produce detailed technical shop drawings that include:

  • Precise dimensions and tolerances
  • Sink, faucet, and appliance cutout placements
  • Edge profile details
  • Finish callouts and patina direction
  • Substrate and installation notes for your contractor

You will review these drawings and provide written approval before any fabrication begins. This step is not a formality — it is one of the most important safeguards in the entire process. Reviewing shop drawings carefully, ideally with your contractor or project manager present, prevents costly misunderstandings later.

What We Need From You at This Stage

  • Confirmation of all dimensions (ideally verified against the actual space, not just the original plans)
  • Approval of edge profile selection
  • Confirmation of finish and patina direction
  • Any final adjustments to cutout placements

We ask that design approval be completed promptly, as fabrication lead times do not begin until signed approval is received. Delays at this stage extend the overall project timeline.


Step Four: Fabrication — The Craft Behind the Timeline

This is where the real work happens, and it takes time done properly. Our skilled artisans, all working in-house in the United States, hand-cast, hand-form, and hand-finish every piece to your exact specifications. There are no shortcuts here, and we would not have it any other way.

Standard fabrication lead times run approximately 12 to 14 weeks from the date of design approval and deposit receipt. Custom range hoods, large-format bar tops, or pieces with particularly intricate edge details may carry longer lead times, which we communicate clearly upfront.

What happens during those weeks:

  • Material sourcing and casting: We use only the highest quality alloys available, sourced and processed in the USA.
  • Forming and fitting: Each piece is shaped to your precise specifications, with every cutout, corner, and profile executed by hand.
  • Finishing: Whether your piece will carry a polished pewter surface, a naturally aged zinc finish, or an antiqued bronze patina, the finishing process is painstaking and cannot be rushed without compromising the result.
  • Quality review: Before anything leaves our facility, every piece is inspected by our team against the original shop drawings.

Why Lead Times Matter — and How to Plan Around Them

The most common source of project stress in custom metalwork is a mismatch between design timelines and fabrication realities. If your kitchen renovation is scheduled to complete in fourteen weeks, your metal countertop order should already be in fabrication. We strongly encourage designers and contractors to initiate the consultation process at least four to five months before the intended installation date on complex projects.

We are transparent about our schedule, and we will tell you honestly if a requested delivery date is achievable. Respecting your timeline means protecting the quality of every piece that leaves our studio.


Step Five: Delivery and Installation

When your piece is complete and has passed our quality review, our team coordinates shipping or freight logistics with you directly. Large countertops and bar tops ship via white-glove freight carriers experienced in handling custom architectural metalwork. We provide packaging and crating appropriate to the piece and the distance it will travel.

What to Have Ready at the Job Site

  • A prepared substrate: Metal countertops require a stable, level substrate — typically plywood — adhered and fastened to your cabinetry. Your contractor should have this ready before delivery.
  • A cleared path: Custom metal pieces can be large, heavy, and delicate on their finished faces. Clear a safe route from delivery point to installation location.
  • Your installer briefed: We provide installation guidance notes with every shipment. We also encourage your contractor or installer to reach out to our team with questions before the installation day, not during it.

Minor Field Adjustments

In some cases, field conditions differ slightly from the original drawings — a wall that is not perfectly plumb, a cabinet that shifted during construction. Cast metal countertops can accommodate minor scribe adjustments, but significant dimensional changes are not possible in the field. This is another reason why verifying your dimensions carefully before approving shop drawings is so important.


Ongoing Care: Living Metals Are Meant to Age

One of the qualities that makes cast metal countertops genuinely heirloom-quality is their ability to develop character over time. Zinc, pewter, brass, bronze, and copper are living surfaces. They patinate. They respond to use. They become more beautiful with age rather than less.

We provide care instructions tailored to your specific metal and finish with every completed project. In general:

  • Zinc and pewter can be maintained with simple mineral oil applications and, if desired, periodic buffing to slow natural patination.
  • Polished pewter can be brought back to a near-mirror finish with regular polishing.
  • Bronze and brass develop patina gradually and can be stabilized with wax coatings.
  • Copper is the most reactive of the metals we work with and will patinate noticeably over months of use.

Encourage your clients to embrace the living quality of their surfaces. A zinc countertop that has aged through five years of cooking and gathering tells a story no manufactured surface ever could.


Frequently Asked Questions

How long does the full process take from first contact to installation?
For most custom countertop and bar top projects, allow approximately 16 to 20 weeks from initial consultation through delivery — accounting for design approval, fabrication, and shipping. Complex or large-scale commercial projects may require more time, which we discuss clearly at the outset.

Can I see samples of your metals before committing?
Yes. We can provide material samples so you can evaluate finish, color, and texture in your actual project environment before finalizing your selection.

Do you work directly with general contractors and fabricators, or only designers?
We partner with designers, architects, homeowners, hospitality groups, and contractors across North America. Whoever leads your project, we integrate smoothly into the team.

What is required to begin fabrication?
Signed design approval on our technical shop drawings and a deposit. We will confirm both requirements and amounts during the proposal stage.

Do you offer any ready-to-order options for faster timelines?
Yes — the Bastille Collection is our trade-exclusive line of cast metal range hoods in standard sizes, available in cast zinc and brass, designed for designers and high-end builders who need volume and consistency without sacrificing quality.


Starting Your Project With La Bastille

Working with a skilled metal countertop fabricator should feel like a creative partnership, not a transaction. When you bring a project to La Bastille, you are working with an in-house team of designers and artisans who care genuinely about the outcome — people who find satisfaction in producing a piece of cast zinc or hand-finished pewter that will outlast the cabinets beneath it, the trends around it, and perhaps even the building it lives in.

We are proud to fabricate every piece in the United States, using the highest quality alloys available, with no shortcuts and no outsourcing of the craftsmanship that defines our work.

If you are ready to begin, we welcome the conversation. Reach out to our team to schedule a design consultation, request material samples, or ask any questions about your project. We respond within one to two business days and are glad to work around your schedule.